Industry news|2022-02-28| admin
The main components of the plum blossom elastic coupling are the shaft sleeves at both ends and the elastic body in the middle. The elastic coupling can transmit torque with zero backlash and no vibration. Backlash can be eliminated with elastomers. Some problems will also be encountered in the application of elastic couplings. Today, I will introduce to you how to install elastic couplings during use and what to pay attention to.
1. Before installation, first check whether the two shafts of the prime mover and the working machine are concentric, whether there is wrapping paper and collision on the surfaces of the two shafts, whether there are debris in the inner holes of the two half couplings of the plum coupling, and whether there is collision at the edge of the inner hole . If so, clean the shaft and coupling halves and use a fine file to handle the bumps. Then check whether the diameter and length of the inner hole of the two half couplings are consistent with the diameter and length of the shaft extension of the prime mover and the working machine. In general selection, it is better to let the length of the half coupling at the end of the prime mover and the working machine be less than the length of its shaft extension by 10-30mm.
2. In order to facilitate installation, it is best to put the two half couplings into a 120-150 incubator or oil tank for preheating, so that the size of the inner hole is increased and it is easy to install. After installation, make sure that the shaft head cannot protrude from the end face of the half coupling, preferably flush. Detect the distance between the two half couplings: measure the readings of 3-4 points along both sides of the half coupling flange, as well as the sum of the measured dimensions of the extension section and the two membrane groups, and the error is controlled in the range of 0-0.4mm Inside.
3. Correction: use a dial indicator to detect the runout of the flange end face and outer circle of the two halves of the coupling. When the outer circle of the flange is less than 250mm, the runout value shall not be greater than 0.05mm; when the outer circle of the flange is greater than 250mm, the runout value shall not be greater than 0.08.
4. Install bolts: Insert the bolts from the outside of the small hole of the flange, and pass through the outside of the large hole of the other flange. Put on the buffer sleeve, elastic washer, twist the nut, and tighten the nut with a wrench. If the installation is uncomfortable or disassembled for replacement, the shaft and half-coupling will not be damaged, and it is best to rotate freely after installation.
5. Operation instructions: Before starting the equipment, check whether the nut of the plum coupling is loose or falls off. If so, tighten the nut with a wrench in time.
The installation process of the plum blossom coupling does not require too many preparations. The main thing is to do the preparatory work before installation, grasp the details of the installation well, and do the debugging work well. More is still a matter of details, so try not to install it before the preparations are done. For more questions, you can consult Shenzhen Weidong.
| 久久99精品国产 | 日韩无码中文视频 | 日本公妇乱婬免费视频一区三区 | 亚洲99精品99| 欧美成人免费播放 | 久久久久av无码免费毛片 | 安徽丰满少妇BBBBBB | 无码人妻精品一区二区三区蜜臀 | 91人妻人人澡人人爽人人精品 | 91精品国产色综合久久久蜜香臀 | 超碰人妻超碰人妻色偷偷 | 西西人体A片无码视频 | 国产精品无码第三页 | 国产人妻精品一区二区三区99 | 免费一级全黄少妇性色生活片内射 | 日本人做爰毛片免费播 | 无码人妻一区二区三区免费京洛会 | 91人妻丰满熟妇a无码 | 国产成人片91嫩草传媒 | 红桃视频成人A片免费播放 国产91足控脚交在线观看 | 国产精品毛片无码一区二区 | 精品国产乱码一区二区三区 | 男女午夜视频在线观看 | 亚洲自拍偷拍视频 | 免费一级无码婬片A片APP直播 | 国产高清在线观看 | 黄 色 视 频在线观看 | 欧一美一婬一伦一区二区三区自慰 | 四川少妇BBBBBB爽爽小说 | 欧美一区二区三区成人久久片 | 亚洲无码在线免费观看 | 一级A片巜色情荒野 | 精品毛片在线观看 | 国产熟妇毛多 久久久久一区 | www.黄色视频 | 丰满少妇被猛进去高潮 | 波多野结衣无码欧美在线播放69 | 蜜桃视频 在线观看免费 | 免费看黄 片,在线观看 | 黄色美女视频网站 |